UNB Fredericton Construction Map Archive

Search Filter

   


Construction Project

Project Title: Window Replacement

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Upgrade of exterior windows


Construction Project

Project Title: Alumni Memorial Ground Floor Renovations

Estimated Start Date: Feb 24, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Renovate lower floor of the Alumni Memorial building for new location of Development and Donor Relations


Construction Project

Project Title: Alumni Memorial Window Replacement

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Upgrade all exterior doors and windows.


Construction Project

Project Title: CHP Renewal Project

Estimated Start Date: Jan 01, 2012 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Installation of a new 28,000 pph fire tube boiler, construct an addition to the CHP building, replacement of two existing water tube boilers, upgrade of plant control system.


Construction Project

Project Title: Bailey Hall Classroom 102

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Complete Renovation


Construction Project

Project Title: Marshall D'Avray Hall Renovate 322A-C

Estimated Start Date: Feb 10, 2013 01:00 am

Estimated End Date: Mar 31, 2014 01:00 am

Details:

Renovate Offices 322A-C for ALPS and UGSW.


Construction Project

Project Title: Renovate Classroom 111

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Complete room renovation


Construction Project

Project Title: Replace Class Room Furniture Rm 320,321,322 & 337

Estimated Start Date: Aug 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Replace tables in chairs in classrooms


Construction Project

Project Title: Renovate Classrooms 151 & 161

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Complete Classroom Renovations


Construction Project

Project Title: Renovate Classroom 303

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Complete Classroom Renovation


Construction Project

Project Title: D-10 Data Centre Renovation

Estimated Start Date: Dec 01, 2014 01:00 am

Estimated End Date: Nov 30, 2015 01:00 am

Details:

Project involves updating the Architectural, Mechanical & Electrical Systems of the D-10 Data Centre


Construction Project

Project Title: Exterior Step Replacement West Side

Estimated Start Date: Jun 02, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Reconstruction of exterior stone steps on west entrance of building.


Construction Project

Project Title: McLeod House 2nd Floor Office Renovations

Estimated Start Date: Mar 27, 2014 10:00 am

Estimated End Date: Jun 30, 2014 01:00 am

Details:

Renovations throughout the second floor of McLeod House to create temporary office space.


Construction Project

Project Title: Bailey Hall Lecture Theatre Renovations

Estimated Start Date: Mar 27, 2014 10:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Complete interior renovation to the Lecture Theatre including new flooring, walls, seating, lighting, HVAC & AV equipment. 


Construction Project

Project Title: Incutech Building 2 Ventilation & Lab Renovations

Estimated Start Date: Mar 27, 2014 10:00 am

Estimated End Date: Jun 30, 2014 01:00 am

Details:

Renovations to add ventilation throughout second floor of EUNB Building 2 as well as various renovations to Nano Research Labs


Construction Project

Project Title: Toole Hall Lab 308 Renovations

Estimated Start Date: Mar 27, 2014 10:00 am

Estimated End Date: Jun 30, 2014 01:00 am

Details:

Renovations to Nano Research Lab 308


Construction Project

Project Title: IUC Forestry HVAC Upgrade

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Apr 30, 2015 01:00 am

Details:

Upgrades to Heat Recovery System throughout building.


Construction Project

Project Title: Storage Space

Estimated Start Date: Apr 16, 2014 01:00 am

Estimated End Date: Jun 30, 2014 01:00 am

Details:

Create storage space in basement and enclose stairwell.


Construction Project

Project Title: Window, Door & Siding Replacement Phase 2

Estimated Start Date: Jun 02, 2014 01:00 am

Estimated End Date: Oct 31, 2014 01:00 am

Details:

Replacement of remaining window and doors as well as replacing the remaining exterior tile panels with new metal to match work done in Phase 1.

Construction Project

Project Title: Bridges House Roof Replacement

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Sep 01, 2014 01:00 am

Details:

Roof replacement on Bridges House and apartment link.


Construction Project

Project Title: Annex C Roof Replacement

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Jul 30, 2014 01:00 am

Details:

Roof replacement.


Construction Project

Project Title: Campus Sidewalks Phase III

Estimated Start Date: Jun 16, 2014 01:00 am

Estimated End Date: Jul 15, 2014 01:00 am

Details:

Sidewalk replacement & retaining wall.


Construction Project

Project Title: Neill House High Voltage Underground Piping

Estimated Start Date: Jun 24, 2014 01:00 am

Estimated End Date: Jul 03, 2014 01:00 am

Details:

Install new underground High Voltage piping at Neill House breezeway.


Construction Project

Project Title: Neill House Window Cladding

Estimated Start Date: Jul 03, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

Window, wall cladding at front entrance to Neill House

Construction Project

Project Title: Bank Bookstore Window Replacement

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Window Replacement


Construction Project

Project Title: Retaining Wall Replacement

Estimated Start Date: Jul 15, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

This project is to replace lower retaining wall at Facilities Management Building


Construction Project

Project Title: HIL to Singer Hall Link Automatic Doors

Estimated Start Date: May 01, 2014 01:00 am

Estimated End Date: Jul 31, 2014 01:00 am

Details:

Installing automatic door operators on all of the doors located in the tunnel between the HIL and Singer Hall


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: Jun 02, 2014 01:00 am

Estimated End Date: Aug 29, 2014 01:00 am

Details:

Project is to replace exterior & interior entrance doors at main entrance on west elevation of residence


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: Aug 01, 2014 01:00 am

Estimated End Date: Nov 30, 2014 01:00 am

Details:

Project is to replace entrance doors on north face of building


Construction Project

Project Title: Renovate Room S148

Estimated Start Date: May 20, 2014 01:00 am

Estimated End Date: Aug 29, 2014 01:00 am

Details:

Project is to renovate room to create new lab space

Construction Project

Project Title: Multimedia Upgrade Room E42

Estimated Start Date: Jun 02, 2014 01:00 am

Estimated End Date: Jul 30, 2014 01:00 am

Details:

Project to make multimedia upgrades to room E42 Head Hall


Construction Project

Project Title: Window Lintel Reinforcement

Estimated Start Date: Jul 15, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

Project to install window lintel reinforcing to masonry on the East elevation


Construction Project

Project Title: Hot Water Tank Bundle Replacement

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Aug 01, 2014 01:00 am

Details:

Project is to replace steam hotwater tank exchanger & flange


Construction Project

Project Title: SW Wall Masonry Repairs

Estimated Start Date: Jul 15, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

Project is to replace window lintels, as well as make brick & sandstone masonry repairs


Construction Project

Project Title: Entrance Pillar Repairs

Estimated Start Date: Jul 15, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

Project is to make repairs to sandstone entrance pillars


Construction Project

Project Title: Masonry Repairs

Estimated Start Date: Jul 15, 2014 01:00 am

Estimated End Date: Aug 15, 2014 01:00 am

Details:

Project is to make repairs to sandstone & brick in the breezeway between Bridges House & Neill House


Construction Project

Project Title: Building Heat Exchanger Replacement

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Aug 01, 2014 01:00 am

Details:

Project is to replace steam heat exchanger for DKT heating system


Construction Project

Project Title: Front Brick Entrance Repairs

Estimated Start Date: Jun 01, 2014 01:00 am

Estimated End Date: Jul 01, 2014 01:00 am

Details:

Project is to make repairs to buttress walls at main entrance


Construction Project

Project Title: Entrance Gate Repairs

Estimated Start Date: Jun 01, 2014 01:00 am

Estimated End Date: Jul 01, 2014 01:00 am

Details:

Project is to retore masonry at the J. Leonard O'Brien Gates


Construction Project

Project Title: Foundation Repairs PH2

Estimated Start Date: Jun 15, 2014 01:00 am

Estimated End Date: Jul 15, 2014 01:00 am

Details:

Project is to make repairs to foundation & building drainage at SUB Annex


Construction Project

Project Title: Masonry Repairs

Estimated Start Date: Oct 15, 2014 01:00 am

Estimated End Date: Nov 07, 2014 01:00 am

Details:

Project is to make masonry repairs to building exterior


Construction Project

Project Title: DKT - EUNB Steam Infrastructure Renewal PH2

Estimated Start Date: Jun 01, 2014 01:00 am

Estimated End Date: Jul 15, 2014 01:00 am

Details:

Project is to replace 100' of buried steam infrastructure


Construction Project

Project Title: DKT - EUNB Steam Infrastructure Renewal PH3

Estimated Start Date: Sep 29, 2014 01:00 am

Estimated End Date: Nov 15, 2014 01:00 am

Details:

Project is to replace 60' of buried steam infrastructure


Construction Project

Project Title: Stair Upgrade - Main Lobby (132)

Estimated Start Date: Jul 07, 2014 01:00 am

Estimated End Date: Aug 08, 2014 01:00 am

Details:

Project is to remove existing stair treads & replace with new. Main Lobby Entrance.


Construction Project

Project Title: Washroom Upgrade - First Floor

Estimated Start Date: Jun 16, 2014 01:00 am

Estimated End Date: Aug 22, 2014 01:00 am

Details:

Renovate existing men's and women's washrooms located on the first floor to fully accessible washrooms.


Construction Project

Project Title: Stair Pan Replacement - (A198)

Estimated Start Date: Jul 07, 2014 01:00 am

Estimated End Date: Aug 08, 2014 01:00 am

Details:

Project is to remove portion of existing stair pan & replace with new stair pan. North/East Corner


Construction Project

Project Title: Painting Corridor - First Floor

Estimated Start Date: Jun 16, 2014 01:00 am

Estimated End Date: Aug 01, 2014 01:00 am

Details:

Painting the First Floor main Lobby Corridor.


Construction Project

Project Title: Stair Flooring Upgrade - Area 251

Estimated Start Date: Jul 14, 2014 01:00 am

Estimated End Date: Jul 25, 2014 01:00 am

Details:

Project is to remove existing stair flooring & replace with new. Four stairs located in area 251


Construction Project

Project Title: Controls Upgrade

Estimated Start Date: Jun 16, 2014 01:00 am

Estimated End Date: Aug 22, 2014 01:00 am

Details:

Control Upgrade throughout the entire building.


Construction Project

Project Title: Renovate Room 310

Estimated Start Date: Jul 02, 2014 01:00 am

Estimated End Date: Aug 29, 2014 01:00 am

Details:

Project is complete renovation of Individual Study space in room 310


Construction Project

Project Title: Renovate Basement Room 012

Estimated Start Date: Jul 02, 2014 01:00 am

Estimated End Date: Aug 29, 2014 01:00 am

Details:

Project is to do a complete renovation to basement room 012


Construction Project

Project Title: Renovations to Lab 129

Estimated Start Date: Jun 03, 2014 01:00 am

Estimated End Date: Dec 15, 2014 01:00 am

Details:

Project is to update all finishes in lab including, but not limited to, flooring, benches, ceiling, lighting, AV & gas/air/vacuum piping


Construction Project

Project Title: Install metal cladding and soffit on Neill House Breezeway

Estimated Start Date: Jun 25, 2014 01:00 am

Estimated End Date: Jul 04, 2014 01:00 am

Details:

Install metal cladding and soffit on Neill House Breezeway


Construction Project

Project Title: Neville House Breezeway Cladding

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Aug 29, 2014 01:00 am

Details:

Install metal cladding and soffit on Neville House Breezeway.


Construction Project

Project Title: Room E42 Multimedia Upgrades

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Jul 30, 2014 01:00 am

Details:

Project is to make upgrades to multimedia equipment in room E42


Construction Project

Project Title: Room H224 Multimedia Upgrades

Estimated Start Date: Jul 01, 2014 01:00 am

Estimated End Date: Jul 30, 2014 01:00 am

Details:

Project is to make upgrades to multimedia equipment in room H224


Construction Project

Project Title: Bailey Hall Aquatics Lab

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Jul 15, 2015 01:00 am

Details:

Replace five (5) existing water de-chlorinating tanks which serve the Aquatics Lab.


Construction Project

Project Title: Toole Hall - Lab 213

Estimated Start Date: Aug 01, 2014 01:00 am

Estimated End Date: Dec 17, 2014 01:00 am

Details:

Replace finishes in lab 213, including new casework layout and relocation of fume hood.


Construction Project

Project Title: Penthouse Cladding

Estimated Start Date: Jul 16, 2014 01:00 am

Estimated End Date: Nov 14, 2014 01:00 am

Details:

Project is to install metal cladding over penthouse masonry veneer


Construction Project

Project Title: Window Repairs

Estimated Start Date: Jul 02, 2014 01:00 am

Estimated End Date: Jul 31, 2014 01:00 am

Details:

Project is to repair approximately 12 windows at various locations


Construction Project

Project Title: Roof Replacement

Estimated Start Date: Aug 01, 2014 01:00 am

Estimated End Date: Aug 31, 2014 01:00 am

Details:

Replacement of all flat roof areas other than MacLaggan Addition


Construction Project

Project Title: First Floor Commons

Estimated Start Date: Jul 07, 2014 01:00 am

Estimated End Date: Sep 30, 2014 01:00 am

Details:

Project is to renovate cafeteria area & hallway to create commons space


Construction Project

Project Title: LB Gym Replace Women's Lockers

Estimated Start Date: Oct 01, 2014 01:00 am

Estimated End Date: Dec 23, 2014 01:00 am

Details:

Project is to replace some lockers, move some benches & minor renovations.


Construction Project

Project Title: Replace Flooring in Lounge 207

Estimated Start Date: Oct 01, 2014 01:00 am

Estimated End Date: Oct 31, 2014 01:00 am

Details:

Project is to remove old carpet & install new carpet tile in room 207


Construction Project

Project Title: College Corner Project

Estimated Start Date: Sep 22, 2014 01:00 am

Estimated End Date: Jul 30, 2015 01:00 am

Details:

Project is to do landscaping at the South East corner of the Wu Centre Building


Construction Project

Project Title: SUB Step & Wall Repairs

Estimated Start Date: Nov 15, 2014 01:00 am

Estimated End Date: Dec 15, 2014 01:00 am

Details:

Project is to make repairs to exterior steps and wall


Construction Project

Project Title: Retaining Wall Upgrade

Estimated Start Date: Nov 03, 2014 01:00 am

Estimated End Date: Nov 14, 2014 01:00 am

Details:

Project is to replace section of retaining wall


Construction Project

Project Title: Marshall D'Avray Hall Solar Wall

Estimated Start Date: Feb 02, 2015 01:00 am

Estimated End Date: Apr 30, 2015 01:00 am

Details:

Installation of Solar Wall on South facing exterior walls.

Construction Project

Project Title: MARSHALL D'AVRAY HALL BALCONY HANDRAIL REPLACEMENT

Estimated Start Date: Feb 02, 2015 01:00 am

Estimated End Date: Apr 30, 2015 01:00 am

Details:

Remove and replace Balcony Handrail.

Construction Project

Project Title: Bailey Hall Compressed Air System

Estimated Start Date: Apr 01, 2015 01:00 am

Estimated End Date: Oct 31, 2015 01:00 am

Details:

Installation of new compressed air system.

Construction Project

Project Title: Toole Hall Loading Dock Door Replacement

Estimated Start Date: Apr 01, 2015 01:00 am

Estimated End Date: May 15, 2015 01:00 am

Details:

Remove and replace loading dock door.

Construction Project

Project Title: Ludlow Hall Door Replacement

Estimated Start Date: Mar 02, 2015 01:00 am

Estimated End Date: May 29, 2015 01:00 am

Details:

Remove and replace west side door.

Construction Project

Project Title: Facilities Management new stores office.

Estimated Start Date: Mar 02, 2015 01:00 am

Estimated End Date: Jun 15, 2015 01:00 am

Details:

Construct new office in stores.

Construction Project

Project Title: Harriet Irving Library Third Floor Renovations

Estimated Start Date: Mar 02, 2015 01:00 am

Estimated End Date: Jun 15, 2015 01:00 am

Details:

Third floor renovations.

Construction Project

Project Title: Ludlow Hall Rm 202 Renovations

Estimated Start Date: Mar 18, 2015 01:00 am

Estimated End Date: Apr 01, 2015 01:00 am

Details:

Upgrade lighting, ceilings, ventilation, ducting, flooring and painting.

Construction Project

Project Title: MacLaggan Hall Rm 207

Estimated Start Date: Mar 18, 2015 01:00 am

Estimated End Date: Mar 29, 2015 01:00 am

Details:

Upgrade, lighting, ceilings, and ventilation ducting.

Construction Project

Project Title: MacLaggan Hall Rm 109

Estimated Start Date: Mar 18, 2015 01:00 am

Estimated End Date: Apr 10, 2015 01:00 am

Details:

Upgrade lighting, ceilings and ventilation ducting.

Construction Project

Project Title: ITS VOIP Project

Estimated Start Date: Mar 18, 2015 01:00 am

Estimated End Date: Jul 01, 2015 01:00 am

Details:

VOIP Installation and HUB removals. Various campus buildings.

Construction Project

Project Title: Theatre 143 Doors

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Jun 30, 2015 01:00 am

Details:

Project is to replace main entrance doors to theatre room 143


Construction Project

Project Title: Currie Centre Engergy Project

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jun 30, 2016 01:00 am

Details:

Project is to complete lighting upgrades in both gymnasiums and mechanical upgrades throughout the building.


Construction Project

Project Title: Lounge Furniture

Estimated Start Date: Apr 27, 2015 01:00 am

Estimated End Date: Jul 17, 2015 01:00 am

Details:

Project is to replace existing lounge furniture throughout DKT complex


Construction Project

Project Title: AV Upgrades - RM FG303

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Jun 30, 2015 01:00 am

Details:

Project is to install new projector, screen, speakers & controls in classroom FG303


Construction Project

Project Title: Harriet Irving Library Energy Project

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to complete lighting upgrades throughout the building


Construction Project

Project Title: Mens & Womens Locker Rooms

Estimated Start Date: Mar 30, 2015 01:00 am

Estimated End Date: Apr 30, 2015 01:00 am

Details:

Project is to install additional lockers in mens and womens locker rooms


Construction Project

Project Title: Dish Return Area

Estimated Start Date: Jun 22, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to upgrade dish return area


Construction Project

Project Title: Atrium Flooring

Estimated Start Date: Mar 23, 2015 01:00 am

Estimated End Date: Apr 08, 2015 01:00 am

Details:

Project is to replace existing cafeteria atrium flooring


Construction Project

Project Title: Restoration and Repairs

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Jul 15, 2015 01:00 am

Details:

Project is to repair storm damage to McCord Hall


Construction Project

Project Title: Penthouse Roof Replacement

Estimated Start Date: Aug 03, 2015 01:00 am

Estimated End Date: Sep 16, 2015 01:00 am

Details:

Project is to replace the penthouse roof


Construction Project

Project Title: Lab 155 Renovation

Estimated Start Date: May 15, 2015 01:00 am

Estimated End Date: Jun 30, 2015 01:00 am

Details:

Project is to complete renovations to lab 155 including modifications for additional research equipment, changes to various infrastructure and new layout of space


Construction Project

Project Title: Dechlorinating Tank Replacement

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: May 29, 2015 01:00 am

Details:

This is content

Any content canbe added in here


Construction Project

Project Title: Replace Dish Machine

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jul 15, 2015 01:00 am

Details:

Project is to replace the existing dish machine serving the DKT kitchen


Construction Project

Project Title: Lighting Upgrade

Estimated Start Date: Apr 23, 2015 01:00 am

Estimated End Date: May 29, 2015 01:00 am

Details:

Project is to upgrade lighting throughout building


Construction Project

Project Title: Shingled Roof Replacement, Head Hall

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace the shingled roof at Head Hall on the Old Civil Engineering area


Construction Project

Project Title: Shingled Roof Replacement

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace the shingled portion of roof at Forestry & Geology building


Construction Project

Project Title: Roof Replacement

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace roof shingles at Burden Academy building


Construction Project

Project Title: Classroom Renovation Rm 323

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Complet renovation of Classroom 323 including floor, ceiling, lights, furniture and boards.

Construction Project

Project Title: Classroom Renovation Rm MD220

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 25, 2015 01:00 am

Details:

Complete renovation of classroom MD220 includingng, lights, furniture and boards.

Construction Project

Project Title: Dineen Dr. Tunnel Repair

Estimated Start Date: May 15, 2015 01:00 am

Estimated End Date: Sep 30, 2015 01:00 am

Details:

Repair to infrastructure service tunnel on Dineen Dr. from NRC to STU.

Construction Project

Project Title: Tilley Hall RM T124 Renovation

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Complete renovation of classroom T124 including floor, ceiling, and furniture.

Construction Project

Project Title: Tilley Hall Rm T302 Renovation

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Complete renovation to classroom T302 changing layout of room, new seating and white boards.

Construction Project

Project Title: Exterior Stairwell Lighting

Estimated Start Date: Apr 27, 2015 01:00 am

Estimated End Date: May 25, 2015 01:00 am

Details:

Project is to install exterior lighting along stairwell between Head Hall & Lady Beaverbrook Residence as well as parking lot lighting behind LBR

Construction Project

Project Title: Campus House Roof Replacement

Estimated Start Date: May 11, 2015 01:00 am

Estimated End Date: Jun 30, 2015 01:00 am

Details:

Roof replacement.

Construction Project

Project Title: Keirstead Hall Sidewalk

Estimated Start Date: May 11, 2015 01:00 am

Estimated End Date: Jun 05, 2015 01:00 am

Details:

Remove and replace sidewalk.

Construction Project

Project Title: GE126 AV Upgrade

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: May 30, 2015 01:00 am

Details:

Project is to install new Projector, Screen & Speakers and also move smart board


Construction Project

Project Title: LB Gym A116 AV Upgrade

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: May 30, 2015 01:00 am

Details:

Install projector and screen.

Construction Project

Project Title: Old Engineering Room Renovations

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Renovate H104 and H105A, new ceiling in H105, New floor in H1, Misc. in H3, H3B and H3B-A

Construction Project

Project Title: IUC Central Core Rm 111

Estimated Start Date: May 01, 2015 01:00 am

Estimated End Date: May 31, 2015 01:00 am

Details:

Install acoustic wall panels

Construction Project

Project Title: Keirstead Hall Room Renovations

Estimated Start Date: May 15, 2015 01:00 am

Estimated End Date: May 31, 2015 01:00 am

Details:

Install new portable AC units in both rooms (317A & 320) as a temporary means of boosting the existing AC system.

Construction Project

Project Title: Steam Infrastructure Renewal Phase III

Estimated Start Date: May 25, 2015 01:00 am

Estimated End Date: Jul 31, 2015 01:00 am

Details:

Steam Infrastructure Replacement

Construction Project

Project Title: Renovate 3rd Floor Women's Washroom

Estimated Start Date: Jun 15, 2015 01:00 am

Estimated End Date: Aug 15, 2015 01:00 am

Details:

Renovate 3rd Floor Women's Washroom

Construction Project

Project Title: Replace 2nd Floor Hallway Flooring

Estimated Start Date: Sep 21, 2015 01:00 am

Estimated End Date: Oct 02, 2015 01:00 am

Details:

Replace 2nd Floor Hallway Flooring

Construction Project

Project Title: Harriet Irving Library ERV Unit

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jul 01, 2015 01:00 am

Details:

Install new ERV unit with electric reheat to serve room 306-309, inclusive.

Construction Project

Project Title: RN Scott Hall Flooring

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jul 01, 2015 01:00 am

Details:

Replace existing carpet flooring with gymnasium style flooring and paint all interior walls within space.

Construction Project

Project Title: Harriet Irving Library Partitions

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 03, 2015 01:00 am

Details:

Install partitions with glass tops, approx. 6' high, around 2 sides of the book making machine just inside main entrance.

Construction Project

Project Title: Research Cameras

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jun 30, 2015 01:00 am

Details:

Project is to install cameras throughout select areas of the second floor for research purposes


Construction Project

Project Title: Coffee Shop Renovation

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Jul 31, 2015 01:00 am

Details:

Project is to make renovations to coffee shop area


Construction Project

Project Title: New Flooring

Estimated Start Date: Jun 15, 2015 01:00 am

Estimated End Date: Jul 15, 2015 01:00 am

Details:

Project is to install new flooring in rooms 202, 205 & 305


Construction Project

Project Title: Stairwell Upgrade

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 21, 2015 01:00 am

Details:

Project is to make upgrades to North/East Entrance only of SUB from basement to second floor


Construction Project

Project Title: Apartment Flooring Upgrades

Estimated Start Date: Aug 10, 2015 01:00 am

Estimated End Date: Aug 28, 2015 01:00 am

Details:

Project is to do misc. flooring upgrades.


Construction Project

Project Title: Ceiling Replacement

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 01, 2015 01:00 am

Details:

Project is to replace ceiling in lounge 248


Construction Project

Project Title: Washroom Exhaust

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 28, 2015 01:00 am

Details:

Project is to upgrade washroom exhaust fans


Construction Project

Project Title: Ballroom Flooring & Washroom Upgrade

Estimated Start Date: Feb 18, 2016 01:00 am

Estimated End Date: Mar 16, 2016 01:00 am

Details:

Project is to remove & replace flooring in ballroom. Upgrade men's and women's washrooms on second floor


Construction Project

Project Title: 3rd Floor Women's Washroom Upgrade

Estimated Start Date: Jun 24, 2015 01:00 am

Estimated End Date: Jul 31, 2015 01:00 am

Details:

Project is to upgrade women's washroom on the 3rd floor


Construction Project

Project Title: Way Finding Signs

Estimated Start Date: Aug 01, 2015 01:00 am

Estimated End Date: Aug 15, 2015 01:00 am

Details:

Project is to do a signage upgrade throughout the Student Union Building


Construction Project

Project Title: Basement Washroom Upgrades

Estimated Start Date: Jul 15, 2015 01:00 am

Estimated End Date: Oct 15, 2015 01:00 am

Details:

Project is to upgrade Men's, Women's washrooms and lounge in the basement


Construction Project

Project Title: Shingled Roof Replacement

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace shingled roof portion of LBR roof


Construction Project

Project Title: Old Electrical Engineering Shingled Roof Replacement

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Sep 30, 2015 01:00 am

Details:

Project is to replace the shingled roof area of Old Electrical Engineering


Construction Project

Project Title: Dineen Dr Sidewalk Replacement

Estimated Start Date: May 14, 2015 01:00 am

Estimated End Date: Aug 01, 2015 01:00 am

Details:

Project is to replace sidwalk, curb & gutter for portion of Dineen Drive


Construction Project

Project Title: Replace Flooring In Lounge 116 & 116A

Estimated Start Date: Jun 15, 2015 01:00 am

Estimated End Date: Aug 30, 2015 01:00 am

Details:

Project is to replace flooring in lounge 116/116A


Construction Project

Project Title: Install fixed seating in classroom 107

Estimated Start Date: Sep 26, 2015 01:00 am

Estimated End Date: Nov 09, 2015 01:00 am

Details:

Project is to install fixed seating with power similar to Classroom 111


Construction Project

Project Title: Increase capacity of Classroom 22 with additional workstations

Estimated Start Date: Jun 03, 2015 01:00 am

Estimated End Date: Aug 30, 2015 01:00 am

Details:

Project is to increase capacity of classroom with additional workstations and add power to tops of existing workstations


Construction Project

Project Title: Renovations to Tilley 201 Area

Estimated Start Date: May 29, 2015 01:00 am

Estimated End Date: Dec 07, 2015 01:00 am

Details:

Project is to renovate the space around Tilley 201

Construction Project

Project Title: Dineen Drive Sidewalk & Lighting Upgrade

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 03, 2015 01:00 am

Details:

Project is to install new sidewalk, curb, gutter & street lights along Dineen Drive.


Construction Project

Project Title: Window Lintel Reinforcement Phase 2

Estimated Start Date: Jun 15, 2015 01:00 am

Estimated End Date: Jul 15, 2015 01:00 am

Details:

Project is to provide lintel reinforcement & make crack repairs to building


Construction Project

Project Title: Renovate Various Rooms

Estimated Start Date: Jun 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to renovate H104 & H105A, New Ceiling in H105, New Floor in H1, Misc. in H3, H3B and H3B-A


Construction Project

Project Title: Millham Room AV Upgrades

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to complete AV upgrades in the Millham Room


Construction Project

Project Title: Group Study Rooms - AV Upgrades

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to complete AV upgrades in group study rooms


Construction Project

Project Title: Replace Flooring in Law Library

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace carpet flooring on 2nd and 3rd floors of Law Library

Construction Project

Project Title: Replace Flooring in Lounge 116 & 116A

Estimated Start Date: Jun 15, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace flooring in Lounge 116 & 116A


Construction Project

Project Title: Main Entrance Slab Replacement

Estimated Start Date: Jun 25, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to replace slab over mechanical room at front entrance of building


Construction Project

Project Title: Keirstead Commons Storm Sewer Replacement

Estimated Start Date: Jun 05, 2015 01:00 am

Estimated End Date: Jul 31, 2015 01:00 am

Details:

Project is to replace storm sewer infrastructure in the Keirstead Commons area


Construction Project

Project Title: HIL Third Common Area Flooring & Paint RM 321

Estimated Start Date: Jul 13, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Project is to remove existing flooring and install new carpet tile & paint walls


Construction Project

Project Title: Harriet Irving Library Spandel & Flashing Repairs

Estimated Start Date: Jul 27, 2015 01:00 am

Estimated End Date: Aug 24, 2015 01:00 am

Details:

Spandrel and wall base flashings to be replaced on walls adjacent to main entrance. Hoarding specified, entrance planned to remain open.

Construction Project

Project Title: Carleton Hall Spandrel Flashing & Masonry Repairs

Estimated Start Date: Jul 27, 2015 01:00 am

Estimated End Date: Aug 15, 2015 01:00 am

Details:

Spandrel flashing and masonry repairs on North wall, towards the West end of main entrance.  Plaster and paint repairs included inside room 140. Entrance to remain open.

Construction Project

Project Title: Tilley Hall Spandrel Flashing & Masonry Repairs

Estimated Start Date: Jul 27, 2015 01:00 am

Estimated End Date: Aug 17, 2015 01:00 am

Details:

Spandrel flashing and masonry repairs on North wall in area adjacent to the Carleton Breezeway and parking lot.

Construction Project

Project Title: Harrison Hall Masonry Repairs

Estimated Start Date: Jul 27, 2015 01:00 am

Estimated End Date: Aug 15, 2015 01:00 am

Details:

Brick masonry re-pointing and expansion joint re-caulking work on North wall towards NW corner.

Construction Project

Project Title: NRC Sidewalk Upgrade

Estimated Start Date: Aug 03, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Installation of new sidewalk

Construction Project

Project Title: IUC Physics Rm Renovation

Estimated Start Date: Jul 01, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Renovations to Rms 218-236 IUC Physcis

Construction Project

Project Title: Annex C Foundation Waterproofing

Estimated Start Date: Aug 03, 2015 01:00 am

Estimated End Date: Aug 31, 2015 01:00 am

Details:

Foundation Waterproofing

Construction Project

Project Title: Corridor Infill for Seating

Estimated Start Date: Aug 04, 2015 01:00 am

Estimated End Date: Oct 31, 2015 01:00 am

Details:

Project is to widen corridors on C & D Levels of the link to Gillin Hall to allow for seating/work areas


Construction Project

Project Title: Emergency Generator Upgrade

Estimated Start Date: Sep 01, 2015 01:00 am

Estimated End Date: Feb 28, 2016 01:00 am

Details:

Project is to replace existing emergency generator with new emergency generator


Construction Project

Project Title: Harriet Irving Library 3rd Floor Accessible Washroom

Estimated Start Date: Aug 17, 2015 01:00 am

Estimated End Date: Sep 07, 2015 01:00 am

Details:

Harriet Irving Library 3rd Floor Accessible Washroom

Construction Project

Project Title: Central Heating Plant Compressed Air System

Estimated Start Date: Aug 17, 2015 01:00 am

Estimated End Date: Dec 31, 2015 01:00 am

Details:

Installation of a new compressed air system.


Construction Project

Project Title: Student Union Building Entrance Repalcements

Estimated Start Date: Aug 17, 2015 01:00 am

Estimated End Date: Oct 31, 2015 01:00 am

Details:

Main Entrance and Patio entrance replacements.


Construction Project

Project Title: Aitken House Entrance Replacement

Estimated Start Date: Aug 17, 2015 01:00 am

Estimated End Date: Sep 30, 2015 01:00 am

Details:

Replace two south facing, side entrance's.

Construction Project

Project Title: Lady Dunn Entrance Replacement

Estimated Start Date: Aug 19, 2015 01:00 am

Estimated End Date: Sep 01, 2015 01:00 am

Details:

Lady Dunn Entrance Replacement


Construction Project

Project Title: Marshal Davray Hall Card Access Control

Estimated Start Date: Aug 19, 2015 01:00 am

Estimated End Date: Oct 31, 2015 01:00 am

Details:

Marshal Davray Hall Card Access Control


Construction Project

Project Title: LB Gym Pool Upgrades

Estimated Start Date: Aug 19, 2015 01:00 am

Estimated End Date: Sep 30, 2015 01:00 am

Details:

LB Gym Pool Upgrades


Construction Project

Project Title: Tunnel Access Hatch Replacement

Estimated Start Date: Nov 23, 2015 01:00 am

Estimated End Date: Dec 07, 2015 01:00 am

Details:

Replacement of tunnel access hatch in front of D'Avray Hall.

Construction Project

Project Title: Replace Flooring In Welcome Centre

Estimated Start Date: Dec 18, 2015 01:00 am

Estimated End Date: Jan 05, 2015 01:00 am

Details:

Project is to remove existing flooring and install new flooring


Construction Project

Project Title: Replace Theatre Drapes

Estimated Start Date: Apr 01, 2015 01:00 am

Estimated End Date: Apr 30, 2015 01:00 am

Details:

Project is to replace the theatre drapes in Memorial Hall


Construction Project

Project Title: Replace MRI Magnet

Estimated Start Date: Mar 15, 2016 01:00 am

Estimated End Date: Apr 15, 2016 01:00 am

Details:

Project is to replace an existing MRI Magnet, including removal, installation of supporting electrical & chilled water infastructure and placing of the new magnet.


Construction Project

Project Title: Roof Repair

Estimated Start Date: Feb 15, 2016 01:00 am

Estimated End Date: Apr 15, 2016 01:00 am

Details:

Project is to make repairs to existing copper roofing, installation of attic insulation, attic exhaust fan and new insulated attic access doors.


Construction Project

Project Title: Replace Stair Plans

Estimated Start Date: Mar 01, 2016 01:00 am

Estimated End Date: Mar 16, 2016 01:00 am

Details:

Project is to replace existing stair pans in north-east stairwell, basement to ground level.


Construction Project

Project Title: Install New Interior Window

Estimated Start Date: Mar 15, 2016 01:00 am

Estimated End Date: Apr 01, 2016 01:00 am

Details:

Project is to install new rated window between corridor & lab 210


Construction Project

Project Title: Renovate Classroom D124

Estimated Start Date: Apr 20, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Complete Renovation and AV Upgrades

Construction Project

Project Title: Main Entrance Slab Replacement

Estimated Start Date: May 16, 2016 01:00 am

Estimated End Date: Sep 02, 2016 01:00 am

Details:

Project is to replace the main entrance slab & steps/tunnel top. 


Construction Project

Project Title: Renovate Classroom H211

Estimated Start Date: Apr 20, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Complete Renovation and AV Upgrades

Construction Project

Project Title: Renovate Classroom 3

Estimated Start Date: Apr 20, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Complete Renovation and AV Upgrades

Construction Project

Project Title: Dineen Drive Tunnel Top Replacement

Estimated Start Date: May 10, 2016 01:00 am

Estimated End Date: Jul 25, 2016 01:00 am

Details:

Project is to replace approximately 68' of tunnel top near the Facilities Management builing.


Construction Project

Project Title: Renovate Classroom T223

Estimated Start Date: Apr 20, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Complete Renovation and AV Upgrades

Construction Project

Project Title: Exterior Canopy and Stair Upgrade

Estimated Start Date: May 16, 2016 01:00 am

Estimated End Date: Jun 01, 2016 01:00 am

Details:

Exterior Canopy and Stair Upgrade

Construction Project

Project Title: Flat Roof Replacement

Estimated Start Date: Jun 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Flat Roof Replacement

Construction Project

Project Title: Exterior Stair Replacement

Estimated Start Date: May 02, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Remove existing stairs and replace with new wooden stairs.

Construction Project

Project Title: Kitchen Floor Replacement

Estimated Start Date: Jun 01, 2016 01:00 am

Estimated End Date: Jul 29, 2016 01:00 am

Details:

Kitchen Floor Replacement

Construction Project

Project Title: Shingled Roof Replacement and Masonry Upgrades

Estimated Start Date: May 02, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Shingled Roof Replacement and Masonry Upgrades

Construction Project

Project Title: Classroom T307 & T309 Renovations

Estimated Start Date: Apr 20, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to do complete renovations including combining rooms and AV upgrades


Construction Project

Project Title: Stairwell Upgrades

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 30, 2016 01:00 am

Details:

Project is to replace the nosing on stairs


Construction Project

Project Title: Pitt Lounge Ceiling Replacement

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace the ceiling in the Pitt Lounge


Construction Project

Project Title: Energy Retrofit - Lighting Upgrades

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace light fixtures over ice surface


Construction Project

Project Title: Renovate Classroom ITC317

Estimated Start Date: Jun 15, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to do a complete renovation to room 317


Construction Project

Project Title: Lounge Furniture Replacement

Estimated Start Date: Jun 15, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace furniture in lounges as well as chairs in dining room


Construction Project

Project Title: Exterior Stair Canopy

Estimated Start Date: Jun 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to construct a canopy over the exterior stairs


Construction Project

Project Title: Generator Replacement

Estimated Start Date: Apr 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace generator


Construction Project

Project Title: Stack & Breeching Repairs

Estimated Start Date: Apr 01, 2016 01:00 am

Estimated End Date: Jul 31, 2016 01:00 am

Details:

Project is to replace stack liner and make repairs to breeching


Construction Project

Project Title: Exterior Masonry Repairs

Estimated Start Date: Jun 25, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to make repairs to masonry & pavers near main entrance and NW corner


Construction Project

Project Title: NW Stairwell Masonry Repairs

Estimated Start Date: Jun 25, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to make repairs to masonry at NW Stairwell


Construction Project

Project Title: Lintel Reinforcing Phase III

Estimated Start Date: Jun 15, 2016 01:00 am

Estimated End Date: Jul 31, 2016 01:00 am

Details:

Project is to make masonry repairs & reinforcing window lintels to North Elevation


Construction Project

Project Title: Door Access Control

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to provide card access to exterior doors


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace entrance door facing west


Construction Project

Project Title: Snow Retention System

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to install snow retention system on roof


Construction Project

Project Title: Elevator Repair

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to replace elevator's hydraulic cylinder


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace entrance door facing east


Construction Project

Project Title: Elevator Repair

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to replace elevator's hydraulic cylinder


Construction Project

Project Title: Campus Pharmacy

Estimated Start Date: May 11, 2016 01:00 am

Estimated End Date: Jul 31, 2016 01:00 am

Details:

Project is to create new Campus Pharmacy within the Bank/Bookstore 


Construction Project

Project Title: Elevator Repair

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to replace elevator's hydraulic cylinder


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace entrance facing east


Construction Project

Project Title: Street Light Upgrade

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to replace street lights on Mackay Drive near the Currie Centre


Construction Project

Project Title: Accessibility Upgrades

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to make accessibility upgrades to engineering library


Construction Project

Project Title: Street Lights at Crosswalks

Estimated Start Date: May 12, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to install new street lights at cross walks


Construction Project

Project Title: Install Access Hatch

Estimated Start Date: Jun 01, 2016 01:00 am

Estimated End Date: Jun 30, 2016 01:00 am

Details:

Project is to install new access hatch in one of the mechanical chases


Construction Project

Project Title: Windor Repairs

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to repair windows on the North face of building, on the 3rd & 4th floors


Construction Project

Project Title: Ventilate Telecom Rooms

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to add ventilation to telecommunications closets to remove excess heat


Construction Project

Project Title: Replace Fume Hood Exhaust Fans

Estimated Start Date: Nov 01, 2016 01:00 am

Estimated End Date: Dec 16, 2016 01:00 am

Details:

Project is to replace two remaining old exhaust fans from the north bell tower

Construction Project

Project Title: West Roof Replacement

Estimated Start Date: Sep 30, 2016 01:00 am

Estimated End Date: Dec 14, 2016 01:00 am

Details:

Project is to replace roofing on the west half of building


Construction Project

Project Title: Replace Shelving

Estimated Start Date: Jun 15, 2016 01:00 am

Estimated End Date: Jul 15, 2016 01:00 am

Details:

Project is to replace shelving in Room 11 with high density NSF shelving


Construction Project

Project Title: Replace Walk In Freezer

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Jul 31, 2016 01:00 am

Details:

Project is to replace the walk in freezer


Construction Project

Project Title: Install New Fume Hood

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to install new fume hood in lab B-25


Construction Project

Project Title: Roof Replacement

Estimated Start Date: Jun 15, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace the west roof out South Gym and repair corridor below


Construction Project

Project Title: Cool Elevator Machine Room

Estimated Start Date: Jul 15, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to install new cooling system to serve the elevator machine room


Construction Project

Project Title: Renovations to Aquatics Lab - PHI

Estimated Start Date: May 27, 2016 01:00 am

Estimated End Date: Jun 15, 2016 01:00 am

Details:

Project is complete various renovations to the Aquatics Lab facility, mostly Lab 165


Construction Project

Project Title: Shingled Roof Replacement

Estimated Start Date: Jun 02, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace entire shingled roof


Construction Project

Project Title: Sidewalk Renewal Phase 4

Estimated Start Date: Jul 01, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Project is to replace sidewalks between Harrison House & Bridges House


Construction Project

Project Title: Waterproofing Repairs

Estimated Start Date: Jul 15, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to make repairs to buildings foundation waterproofing on the west elevation near retaining wall


Construction Project

Project Title: Masonry & Caulking Repairs

Estimated Start Date: Jul 15, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to make exterior masonry & caulking repairs at the south elevation


Construction Project

Project Title: Masonry & Caulking Repairs

Estimated Start Date: Jul 15, 2016 01:00 am

Estimated End Date: Aug 15, 2016 01:00 am

Details:

Project is to make exterior masonry & caulking repairs as the north elevation of Neill House


Construction Project

Project Title: Room 27 Renovations

Estimated Start Date: Jun 27, 2016 01:00 am

Estimated End Date: Nov 30, 2016 01:00 am

Details:

Project is to complete miscellaneous renovations


Construction Project

Project Title: Basement Washroom Upgrades

Estimated Start Date: Jul 04, 2016 01:00 am

Estimated End Date: Sep 30, 2016 01:00 am

Details:

Project is to make upgrades to the men's washroom, women's washroom, kitchen & lounge located in the basement of Sir Howard Douglas Hall.


Construction Project

Project Title: OLD ENGINEERING - Room H128

Estimated Start Date: Jul 18, 2016 01:00 am

Estimated End Date: Aug 31, 2016 01:00 am

Details:

Replace flooring and perform minor upgrades in Room H128

Construction Project

Project Title: Car Charging Station

Estimated Start Date: Nov 30, 2016 01:00 am

Estimated End Date: Dec 21, 2016 01:00 am

Details:

Project is to install a new electric car charging station


Construction Project

Project Title: Room 314 Renovation

Estimated Start Date: Feb 22, 2017 01:00 am

Estimated End Date: Mar 31, 2017 01:00 am

Details:

Project is to convert existing storage room 314 into office space.


Construction Project

Project Title: B Level Fan Coil Upgrades

Estimated Start Date: Feb 20, 2017 01:00 am

Estimated End Date: Apr 10, 2017 01:00 am

Details:

Project is to make upgrades to B Level fan coil


Construction Project

Project Title: Renovate women's Locker Room

Estimated Start Date: Apr 24, 2017 01:00 am

Estimated End Date: Jul 28, 2017 01:00 am

Details:

Complete renovation of women's locker room area.

Construction Project

Project Title: Renovate Classroom K103

Estimated Start Date: Apr 24, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Complete Renovation

Construction Project

Project Title: Renovate Classroom MD334-1

Estimated Start Date: Apr 24, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Complete Renovation

Construction Project

Project Title: Renovate Classroom T5

Estimated Start Date: Apr 24, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Complete Renovation

Construction Project

Project Title: NB-IRDT Air Conditioning Upgrade

Estimated Start Date: Mar 16, 2017 01:00 am

Estimated End Date: Apr 15, 2017 01:00 am

Details:

Project is to selectively increase capacity of AC to NB_IRDT Suite.


Construction Project

Project Title: Tweedale Centre Roof Replacement

Estimated Start Date: Apr 14, 2017 01:00 am

Estimated End Date: May 31, 2017 01:00 am

Details:

Project is to replace roof section 1.0


Construction Project

Project Title: Fume Hood Exhaust Fans Replacement

Estimated Start Date: May 01, 2017 01:00 am

Estimated End Date: Jun 30, 2017 01:00 am

Details:

Project is to replace three remaining old exhaust fans from the north bell tower


Construction Project

Project Title: Renovate Second Floor Hallway

Estimated Start Date: May 01, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Project is to upgrade finishes in the 2nd floor hallway


Construction Project

Project Title: Renovate Classroom FG305

Estimated Start Date: Apr 24, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Project is to do a complete renovation to classroom FG305


Construction Project

Project Title: Exterior Masonry Repairs

Estimated Start Date: May 08, 2017 01:00 am

Estimated End Date: Jun 09, 2017 01:00 am

Details:

Masonry and wall repairs on NW patio near main entrance.

Construction Project

Project Title: North Wing Masonry Repairs

Estimated Start Date: May 29, 2017 01:00 am

Estimated End Date: Jun 30, 2017 01:00 am

Details:

Project is to complete miscellaneous masonry repairs to the North Wing


Construction Project

Project Title: Lintel Reinforcing Phase IV

Estimated Start Date: Jun 01, 2017 01:00 am

Estimated End Date: Jul 07, 2017 01:00 am

Details:

Project is to complete masonry repairs & window lintel reinforcing to South Elevation


Construction Project

Project Title: Tunnel Rehabilitation

Estimated Start Date: Jun 15, 2017 01:00 am

Estimated End Date: Sep 01, 2017 01:00 am

Details:

Project is to complete tunnel top replacement over 144 feet on STU campus ground between Holy Cross & George Martin Hall


Construction Project

Project Title: Tunnel Rehabilitation

Estimated Start Date: Jun 30, 2017 01:00 am

Estimated End Date: Sep 01, 2017 01:00 am

Details:

Project is to complete tunnel top replacement over 130 feet in back parking lot to Magee House


Construction Project

Project Title: Tunnel Top Replacement

Estimated Start Date: Oct 10, 2017 01:00 am

Estimated End Date: Nov 30, 2017 01:00 am

Details:

Project is to complete tunnel top replacement new DKT


Construction Project

Project Title: Tunnel Top Replacement

Estimated Start Date: Oct 10, 2017 01:00 am

Estimated End Date: Nov 30, 2017 01:00 am

Details:

Project is to complete replacements near the CHP


Construction Project

Project Title: Tunnel Top Replacement

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Aug 15, 2017 01:00 am

Details:

Project is tunnel top replacement near IUC Physics building & Bailey Hall loading dock


Construction Project

Project Title: Campus Garden

Estimated Start Date: May 31, 2017 01:00 am

Estimated End Date: Jun 30, 2017 01:00 am

Details:

Project is to construct a garden on campus


Construction Project

Project Title: Retaining Wall Replacement

Estimated Start Date: Jun 01, 2017 01:00 am

Estimated End Date: Jul 31, 2017 01:00 am

Details:

Project is to replace the retaining wall infront of CC Jones Student Services on Bailey Dr


Construction Project

Project Title: Campus Sidewalk Replacement

Estimated Start Date: Jun 01, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Project is to replace sidewalks above Toole Hall

Construction Project

Project Title: Retaining Wall Replacement

Estimated Start Date: Jun 01, 2017 01:00 am

Estimated End Date: Jul 31, 2017 01:00 am

Details:

Project is to replace retaining wall at back of building


Construction Project

Project Title: Renovation Asphalt Lab A7

Estimated Start Date: May 15, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to completely renovate the Asphalt Lab A7


Construction Project

Project Title: Elevator Cylinder Replacement

Estimated Start Date: May 08, 2017 01:00 am

Estimated End Date: May 26, 2017 01:00 am

Details:

Project is to remove & replace elevator cylinder & casing


Construction Project

Project Title: Accessibility Upgrades

Estimated Start Date: May 15, 2017 01:00 am

Estimated End Date: Jun 16, 2017 01:00 am

Details:

Project is to replace accessibility ramp & replace interior door & operator


Construction Project

Project Title: Roof Replacement

Estimated Start Date: Jun 15, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Project is to completely replace asphalt roof


Construction Project

Project Title: Asphalt Roof Replacement

Estimated Start Date: May 15, 2017 01:00 am

Estimated End Date: Jun 30, 2017 01:00 am

Details:

Project is to completely replace asphalt roof


Construction Project

Project Title: Ice Plant Renewal

Estimated Start Date: Jan 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to completely replace the Ice Plant


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to replace the West facing entrance


Construction Project

Project Title: Card Access Control

Estimated Start Date: Jun 01, 2017 01:00 am

Estimated End Date: Nov 30, 2017 01:00 am

Details:

Project is to provide all hardware to have exterior doors be card access control


Construction Project

Project Title: Compressed Air Phase 2

Estimated Start Date: Sep 01, 2017 01:00 am

Estimated End Date: Jan 31, 2018 01:00 am

Details:

Project is to install existing compressors on mezzanine level


Construction Project

Project Title: Elevator Cylinder Replacement

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to remove & replace the elevator cylinder & casing


Construction Project

Project Title: Entrance Replacement

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to replace East facing entrance


Construction Project

Project Title: Card Access Control

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Oct 31, 2017 01:00 am

Details:

Project is to provide all hardware at exterior doors for the building to be U-Card access only


Construction Project

Project Title: Elevator Cylinder Replacement

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to remove & replace the elevator cylinder & casing


Construction Project

Project Title: Accessibility Upgrades

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to replace doors & add an automatic door operator


Construction Project

Project Title: Elevator Cylinder Replacement

Estimated Start Date: May 29, 2017 01:00 am

Estimated End Date: Jun 16, 2017 01:00 am

Details:

Project is to remove & replace elevator cylinder & casing


Construction Project

Project Title: Kitchen Elevator Cylinder Replacement

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to remove & replace the elevator cylinder & casing in kitchen area


Construction Project

Project Title: Window Replacement

Estimated Start Date: Sep 01, 2017 01:00 am

Estimated End Date: Oct 31, 2017 01:00 am

Details:

Project is to replace three windows


Construction Project

Project Title: Stained Glass Restoration

Estimated Start Date: May 17, 2017 01:00 am

Estimated End Date: Dec 31, 2017 01:00 am

Details:

Project is to remove, restore & re-install the existing stained glass in refurbished window frames


Construction Project

Project Title: Automatic Door Operators

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to install automatic door operators at various locations throughout building


Construction Project

Project Title: Snow Retention

Estimated Start Date: Aug 01, 2017 01:00 am

Estimated End Date: Sep 30, 2017 01:00 am

Details:

Project is to install a snow retention system on the roof


Construction Project

Project Title: Carleton Hall Masonry Repairs

Estimated Start Date: Jul 24, 2017 01:00 am

Estimated End Date: Aug 21, 2017 01:00 am

Details:

Masonry repairs to east side of main entrance.

Construction Project

Project Title: Bailey Hall Rm 254 Radiation Suite Upgrades

Estimated Start Date: Jul 10, 2017 01:00 am

Estimated End Date: Aug 15, 2017 01:00 am

Details:

Plumbing and miscellaneous upgrades to Rm 254.

Construction Project

Project Title: Replace Flooring in Room 105

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Aug 03, 2017 01:00 am

Details:

Project is to replace flooring in room 105


Construction Project

Project Title: Renovate Computer Lab 008

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Aug 31, 2017 01:00 am

Details:

Project is to provide new computer workstations and paint walls


Construction Project

Project Title: 2nd Floor Lounge Renovation

Estimated Start Date: Jul 01, 2017 01:00 am

Estimated End Date: Sep 01, 2017 01:00 am

Details:

Project is to renovate apartment space to create a 2nd Floor lounge area


Construction Project

Project Title: Tunnel Top Replacement.

Estimated Start Date: Aug 15, 2017 01:00 am

Estimated End Date: Oct 15, 2017 01:00 am

Details:

Tunnel top replacements near DKT and CHP locations.

Construction Project

Project Title: South Emergency Exit Repairs

Estimated Start Date: Aug 15, 2017 01:00 am

Estimated End Date: Oct 16, 2017 01:00 am

Details:

Repairs to emergency exit enclosure located on the South elevation.

Construction Project

Project Title: Room 9 & 22 Renovations

Estimated Start Date: Sep 20, 2017 01:00 am

Estimated End Date: Dec 31, 2017 01:00 am

Details:

Project is to complete general room upgrades


Construction Project

Project Title: Room 217 Power Upgrade & AC

Estimated Start Date: Nov 01, 2017 01:00 am

Estimated End Date: Dec 15, 2017 01:00 am

Details:

Project is to complete power upgrades & AC infrastructure to support new equipment.


Construction Project

Project Title: Lab 42 Renovation

Estimated Start Date: Sep 20, 2017 01:00 am

Estimated End Date: Dec 15, 2017 01:00 am

Details:

PRoject is to upgrade countertops, flooring & paint. Reconfigure power to suite new equipment layout.


Construction Project

Project Title: Tunnel Top Repairs at CHP & DKT

Estimated Start Date: Oct 10, 2017 01:00 am

Estimated End Date: Nov 30, 2017 01:00 am

Details:

Project is to complete tunnel top replacements near DKT & CHP buildings